Project Description

Optimized Stowage – Maximum Intake

Services

  • Stowage plan for maximum intake to secure the order for our customer
  • Attendance of loading operations in Jiangyin/China

Scope

  • Loading and seafastening of total 91 wind tower sections and accessoires, total freight volume about 39,000 cbm
  • Coordination of all parties involved on site
  • Ensure safe and smooth operations

Added Value

  • Stowage plan was optimized on-site by Solumare on request of portcaptain and vessels command
  • Optimized stowage led to optimized weight spreading and seafastening
  • The shipowner was of the opinion that the entire amount of cargo could not be stowed on board. We rescheduled the stowage and according to our specifications, the entire cargo was finally accommodated on board. This is how we secured the order for our customer.

Execution

Click for larger images

Stowage plan for maximum intake carrier ship plus of loading operations in Jiangyin China
Stowage plan for maximum intake Jiangyin China
stowage plan for maximum intake ship and loading operations in Jiangyin China
stowage plan for maximum intake ship and loading operations in Jiangyin China
stowage plan for maximum intake ship in Jiangyin China
stowage planing and loading operations in Jiangyin China
after loading operations on a ship in Jiangyin China
on deck on a ship in Jiangyin China before loading operations
heavy ship storage and loading operations in Jiangyin/China
heavy ship storage and loading operations in Jiangyin/China
heavy loading operations on a ship in Jiangyin/China